Xinjiang Gol pipeline working conditions:
Xinjiang Guole wellhead gas long-distance pipeline project (gas transmission) The products are used in Xinjiang Guole wellhead gas 150,000 m3/d booster transmission project (long-distance pipeline) Design specification DN150-10MPa, operating temperature 60 degrees Celsius, total length 17,000 metres, the joints are full bore 316L stainless steel joints. The project arrived on 15 May 2021 and passed the pressure test on 3 June 2021.